Skip to content
Fleetscape, Precision Ground Cover
For Playground Builders

You build the playground. We make it safe to open.

We install ASTM F1292-compliant engineered wood fiber surfacing air-powered, to the critical fall height your structure needs, scheduled around your build. The playground passes inspection and opens on time, and the surfacing stays compliant long after.

The surfacing should never hold up the opening

You set the structure, then the surfacing arrives late, gets installed to the wrong depth, or fails the fall-height test, and the opening slips while the district waits. We install the surfacing to spec, on your schedule, so the playground opens when you said it would.

  • Compliant to the fall height: ASTM F1292 engineered wood fiber placed to the critical fall height your structure requires.
  • Scheduled around your build: we sequence to your structure install, not the other way around.
  • Protects the structure warranty: compliant surfacing under the equipment, installed without disturbing your work.
  • Compliant for the long run: as the engineered wood fiber compresses over time, we can return to top it up to fall-height compliance, so the playground stays safe years after you have moved on.
Why air-powered

Compliant surfacing, placed in a single visit

Material is carried by air and placed to even, measured depth from the street, filling use zones around and under structures without heavy equipment on your finished work.

300+ ft
of hose reach
ASTM F1292
compliant
Fall height
placed to spec
On your
timeline

We make your build open on time, and keep it compliant

Your build is judged on whether it opens on time and passes inspection. We slot in as the surfacing crew, coordinate timing through you, make sure the playground is inspection-ready on the day, then keep the surfacing compliant for years after.

  • Synced to your install: we schedule our visit to land right when the structure is ready for surfacing.
  • Documentation for inspection: ASTM F1292 critical-fall-height verification handed back for sign-off.
  • Single point of contact: one person to coordinate scheduling and access, so nothing falls between crews.
  • We make you look good: a compliant, clean, inspection-ready surface that reflects well on the playground you built.

Have a playground build coming up?

Send us the structure and the schedule. We will spec the surfacing and coordinate the timing.

How partnering works

From your structure install to an open playground

  1. 1

    Share the structure and schedule

    Send the equipment, the use-zone dimensions, and your build timeline. We spec the surfacing to the critical fall height it requires.

  2. 2

    We coordinate the timing

    We schedule our visit to your structure install, so the surfacing goes in right when the site is ready, with no gap that stalls the opening.

  3. 3

    We install, you open on time

    We place compliant surfacing to the fall height across the use zones, hand back the documentation, and leave you to open an inspection-ready playground.

How it compares

Fleetscape vs. an uncoordinated surfacing sub

FleetscapeUncoordinated sub
Scheduled to your structure install
ASTM F1292 to the required fall heightVaries
Compliance documentation for inspectionRarely
No heavy equipment on your finished work300+ ftRisk
Surfacing kept compliant over time
FAQ

Playground builder questions, answered

Become a partner

Surfacing that opens the playground on time

Bring us your next build. We will spec the surfacing to the fall height, coordinate to your schedule, install compliant engineered wood fiber, and hand back inspection documentation. You open on time, and we keep the surfacing compliant for years after. No obligation to start.

  • ASTM F1292 fall-height-compliant install
  • Scheduling coordinated to your structure build
  • Inspection documentation handed back
  • Ongoing surfacing top-ups to stay compliant

No obligation to start.