Skip to content
Fleetscape, Precision Ground Cover
For Landscape Architects

The installer who honors your spec, on every project

Specify us once and trust the ground cover is built exactly as drawn. We install mulch, decorative bark, and playground surfacing air-powered, to the depths and materials you specified, with the documentation to carry it through plan review.

A spec is only as good as who installs it

You specify the right material at the right depth, then the install goes to low bid and your ground cover gets substituted, value-engineered, or placed wrong. When it fails, the callback finds you. We are the installer who builds the spec you signed.

  • The spec held, not substituted: we install the materials and depths you specified, and flag any conflict back to you rather than swapping on site.
  • Submittal-ready documentation: product data, material specifications, and cut sheets for the mulch and ground cover you specify, packaged for plan review.
  • Spec language you can use: CSI 32 91 13.16 (Mulching) and 32 93 13 (Ground Covers) reference language to drop into your own specifications.
  • One installer across your work: the same standard on every project you design on the Central Coast.
Why air-powered

Placed to spec, not to guesswork

Material is carried by air and placed to even, measured depth from the street, into beds and tight areas a manual crew cannot reach uniformly.

300+ ft
of hose reach
Even depth
to your spec
CSI
spec language
Submittal
ready

We protect the spec you signed

Your name is on the drawings. We install to them, give you the paper to prove it, and never quietly value-engineer your design on site. You keep design authority; we make the built result match it.

  • Depths and materials as specified: no substitutions without your sign-off.
  • Compliance documented: product data and material certifications for what you specify, plus IPEMA and ASTM F1292 documentation for any playground surfacing.
  • Plan-review-ready submittals: product data and cut sheets assembled the way reviewers expect them.
  • A single point of contact: one installer to coordinate with across every project, not a new low bidder each time.

Specifying ground cover on a project?

Send us the spec and we will return product data, compliance documentation, and a submittal packet.

How partnering works

From specification to a built result that matches it

  1. 1

    Specify us, or send the spec

    Name us in the drawings or send your specification. We confirm the materials, depths, and compliance requirements before anything is ordered.

  2. 2

    We document and verify

    You get product data, material specifications, and a plan-review-ready submittal packet, with CSI 32 91 13.16 and 32 93 13 reference language for your specs (and IPEMA and ASTM F1292 documentation for any playground surfacing).

  3. 3

    We install to spec

    We place material to the specified depth across every bed and surface, then hand back the documentation that shows the built result matches the drawings.

How it compares

Specifying Fleetscape vs. leaving install to low bid

FleetscapeLow bid
Materials and depths installed as specifiedVaries
Submittal-ready product data and specsRarely
Plan-review-ready submittal packets
Even depth into hard-to-reach areas300+ ftUneven
No on-site value-engineering of your specCommon
Same installer across your projects
FAQ

Landscape architect questions, answered

Become a partner

Specify us with confidence, on every project you design

Name us in your next specification and we will return the submittal packet, verify compliance, and install exactly what you drew. One installer, one standard, across every project you design on the Central Coast. No obligation to start.

  • Plan-review-ready submittal packets
  • Product data and material specs for what you specify
  • CSI 32 91 13.16 and 32 93 13 reference language for your specs
  • A single installer across all your projects

No obligation to start.