Skip to content
Fleetscape, Precision Ground Cover
For General Contractors

A ground cover sub that hits the date and protects the site

We install mulch, decorative bark, surfacing, compost, and erosion control air-powered, on the date you committed, DIR-registered for prevailing wage and fully insured. We stage from the street, so there is no heavy equipment on your finished site work.

Ground cover should be the last thing that blows your schedule

A sub that no-shows, prevailing-wage paperwork that is never current, equipment that tears up finished hardscape and irrigation: the ground cover scope is small, but it stalls closeout and creates risk. We are the sub that shows up on the date with the paper in order and works clean.

  • We install on the committed date: you schedule us into the sequence and we hold it.
  • Prevailing wage handled: DIR-registered for public works, certified payroll ready.
  • Documentation ready: insurance certificates, bond, and a prequalification packet on request.
  • No damage to finished work: we stage from the street and place material over hardscape and irrigation without driving equipment across it.
Why air-powered

In, placed to spec, and out, without tearing up the site

Material is carried by air and placed to even depth from the street, reaching across finished surfaces and into tight areas no loader can get to without doing damage.

300+ ft
of hose reach
Committed
dates held
DIR
registered
Bonded
& insured

We make the PM’s job easier, not harder

You should not have to manage your ground cover sub. We give your project manager one contact, current documentation, and a crew that arrives prepared and leaves the site clean.

  • A single point of contact: one person for scheduling, submittals, and closeout.
  • Compliance on file: COI, bond, license, and DIR registration uploadable to your system before we mobilize.
  • Clean handoff: we finish, clean up, and walk the work so it is ready for the next trade or for closeout.
  • Public and private work: prevailing-wage public projects and private construction, same reliability.

Have a ground cover scope to sub out?

Send us the scope and the dates. We will return a bid, our prequalification packet, and current compliance docs.

How partnering works

From scope to a clean handoff in three steps

  1. 1

    Send the scope

    Share the ground cover scope, the site, and your schedule. We return an itemized bid and our prequalification packet, with current COI, bond, and DIR registration.

  2. 2

    We lock the date

    You sequence us in. We confirm compliance requirements for the project and hold the committed install date.

  3. 3

    We install and hand off clean

    We stage from the street, place material to spec without crossing finished work, clean up, and walk it with your PM for closeout.

How it compares

Fleetscape vs. a general labor crew

FleetscapeLabor crew
Installs on the committed dateVaries
DIR-registered for prevailing wageVaries
Bonded, insured, prequal packet readyVaries
No equipment on finished site work300+ ft hoseRisk
Single point of contact for the PM
FAQ

General contractor questions, answered

Become a partner

Add a ground cover sub that hits the date

Send us your next ground cover scope. We will return a bid, a prequalification packet, and current compliance docs, then install on the committed date and hand the site back clean. Public or private work, same reliability. No obligation to start.

  • Prequalification packet on request
  • Current COI, bond, and CSLB license
  • DIR registration and certified payroll
  • A single point of contact for your PM

No obligation to start.