Safe, compliant playgrounds and sharp campus grounds
We install playground surfacing, mulch, compost, and bark across your campus with air-powered precision. Compliant, inspection-ready surfacing and even, finished grounds in hours, around your school schedule.
A failed inspection is not an option
A playground out of spec is a liability with a date attached: the next inspection. The campus around it reflects on the whole school. Staying ahead of both shouldn’t pull your facilities team off everything else.
We keep the campus safe and sharp, around your calendar:
- Playground compliance: surfacing installed to ASTM F1292 fall-height depth, inspection-ready.
- Student safety: even fall zones and clean grounds across the campus.
- Around the schedule: we install in hours, scheduled around school hours and breaks.
- On budget: a fixed quote your facilities and finance teams can plan around.
And we do it across one school or a whole district, on a schedule set to the school year.
Done between drop-off and dismissal
The school day goes on. Placement is staged from the street, timed around recess and pickup, and laid to exact depth around every structure.
- 300+ ft
- of hose reach
- To depth
- exact fall zones
- Same day
- back in use
- Hours
- not days
What we install for you
One partner for the materials your campus runs on:
Playground Safety Surfacing
IPEMA-certified engineered wood fiber installed to ASTM F1292 fall-height depth, inspection-ready.
Learn more →Commercial Mulch Installation
Fresh, even mulch across campus beds in a single visit.
Learn more →Compost & Topsoil
Even topdressing for fields and campus grounds.
Learn more →Decorative Bark & Ground Cover
A clean, finished look at entries and gathering areas.
Learn more →
Licensed, insured, and compliant
- CSLB License
- #1151159 · C-27
- DIR Registration
- #2000019015
- Coverage
- Bonded & Insured
- Materials & Compliance
- IPEMA-certified materials · ASTM F1292
Playground or campus due for attention?
Tell us the equipment and the areas, and we’ll send a fixed quote.
Air-powered vs. the alternatives
| Fleetscape | Manual | |
|---|---|---|
| Whole campus in one visit | Days | |
| No disruption to the school day | ||
| One vendor for every ground cover | ||
| Even, finished fall zones | Uneven | |
| District scheduling | Varies | |
| Licensed and insured for commercial work | Varies |
School questions, answered
Free campus assessment + fixed quote in 24 hours
Send us the equipment list and the areas, or we’ll come measure. You get fall-zone depths checked, the campus mapped, and a fixed quote within 24 hours.
- Free coverage assessment
- Photos and measurements of every area
- Campus-wide pricing and cadence
- District-wide pricing in one number
No obligation, and straight answers about your compliance.